YD 5173-2015 数字蜂窝移动通信网WCDMA工程验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

Foreword

According to the requirements of Document GONGXINTINGTONG〔2012〕No.160 issued by the General Office of the Ministry of Industry and Information Technology"Notice on Arranging the Development Plan of Communication Engineering Construction Standards in 2012",this revised code has been developed by amending the Provisional Acceptance Specifications for 2GHz WCDMA Digital Cellular Mobile Communication System(YD/T 5173-2009)issued by the Ministry of Industry and Information Technology.

This code is comprised of general provisions,terms and symbols,pre-acceptance inspection,preliminary acceptance,commissioning,final acceptance and appendixes.

Articles 3.4.2 and 3.6.3 printed in bold type are compulsory provisions and must be enforced strictly.

The Communication Development Department of MIIT is responsible for explaining and supervising implementation of this code.If any supplements or revisions are found to be necessarily supplemented or revised during the implementation process,please contact the Communication Development Department and post the supplements or revisions to the Department(Address:No.13 Xichangan Avenue,Beijing,Postcode:100804).

Former Chief Development Organization:

      CITCC No.2 Engineering Co.,Ltd.

Chief Development Organization:

      China International Telecommunication Construction Corporation

Chief Drafters:

      Meng Ruiwen Zhang Xingwu Ren Rong Wang Jianguo

Participating Organizations:

      Liaoning Planning and Designing Institute of Post and Telecommunication Co.Ltd.

      China Information Technology Designing Consulting Co.,Ltd.and Huaxin Consulting

      Co.,Ltd.

Chief Participants:

      Li Suzhi Li Zhichao Chang He Li Meng Wang Bin

Translators:

      Lian Rongrong Li Quanfa Zhao Hang Li Weimin

Translation Proofreader:

      Wang Fengwu Meng Yongye Wang Chao Jiang Shaodong