![GB50402-2007烧结机械设备工程安装验收规范(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/849/33688849/b_33688849.jpg)
6.13 Sealing Slide and Sealing Plate
Ⅰ Dominant Item
6.13.1 Countersunk-headed screw for fixing sealing slide must lower than sliding face of the slide.
Check quantity:to check all.
Inspection method:inspection.
6.13.2 Preset thermal expansion gap for every part of sealing slide,must meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation quality records or to take actual measurements.
Ⅱ General Item
6.13.3 Tolerance for installation of sealing slide shall meet requirements in Table 6.13.3,see Figure 6.13.3.
Examination:to check all.
Inspection method:see Table 6.13.3.
Table 6.13.3 Tolerance for installation of sealing slide
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_23.jpg?sign=1739282097-6CfMjBVEgxCxJzYUa2oBnSIYlmVbmMeN-0-0bb79aa5eed5df6577ededb97494b86a)
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_24.jpg?sign=1739282097-2SxMGIT3I0RhBklsTabZ2QyFoaacnI0x-0-e28f95a69c2befabdb355e166974b9ad)
Figure 6.13.3 To survey elevation of sealing slide
1-Trolley rail;2-Sealing slide;3-Longitudinal centerline of sintering equipment
6.13.4 Tolerance for installation of plate movable sealing plate shall meet requirements in Table 6.13.4.
Check quantity:to check all.
Inspection method:see Table 6.13.4.
Table 6.13.4 Tolerance for installation of plate movable sealing plate
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_25.jpg?sign=1739282097-CYXg9cMSt5Wo7ioq5FVbJZFbzK0xAPk4-0-4966e69fd995a67ba422f9fd3fb2c116)